Various choices are available to suit differing needs eg. Debonding of cable, corrosion protection through intensive sand blasting and painting process, fish hooks and swages for up hole installation, factory fitting of grout and/or breather tubes to save site labour costs.
- Available In 12.7mm dia, 15.2mm dia and 18.0mm dia
- Available in Plain, Bulb, Birdcage and Partial Birdcage
- 7mm dia. single – installed into split sets for improved load capacity
- Strandpacks – These are available in centre-pull reeless coils.
- Split Set Mining Systems have specially designed dispensers to ensure the strand is pulled from the coil correctly. Available in 3 tonne or 1 tonne (right hand lay for standard cabolter applications. Left hand is available on request.) External protective wrapping & pallets available.